Copy
If you no longer wish to receive our Newsletter please use the unsubscribe link below
View this email in your browser

The VIC 96 Trust


Newsletter No 5 - March 2014


Saturday 8th March
Present: Jim, Brian, Ray, Bill
 
Ray and Brian spent the morning cleaning mud hole door covers ready for reassembly of the boiler once it has been inspected.  Bill prepared eye splices in the mooring ropes. Jim painted the companion way to the after cabin in gloss white.

Saturday 15th March
Present: Sam, Jim

Sam and Jim completed the painting of the companionway to the after cabin.
 
Saturday 22nd March
Present:Frank (briefly), David, Brian, Ray, Derek,  Jim.
 
During the previous week Frank had done a marvellous machining job on the new condenser end cover. Brian lowered it into the engine room.   David cleaned up and freed all the studs, bolts & nuts for the condenser.   Derek, Brian and Ray started assembly of the lifeboat gantry which will span the hatch cover.
 
Jim painted the inner faces of the 6 steel doors serving the fo'c'sle, galley, engine room, heads & after cabin. I then repainted them after everyone had walked into them.
 
Regards,
Jim
 
Next Work Party Date - Saturday 5th April
Copyright © 2014 VIC 96 Trust, All rights reserved.


unsubscribe from this list    update subscription preferences 

Email Marketing Powered by Mailchimp