Copy

Liftra delivers tailor-made solutions for special lifting
and transportation tasks within the turbine industry

Blades installed on 3rd GE’s Haliade 150-6MW Offshore with the latest Liftra Blade Lifting Yoke

 
Liftra is proud of being part of the team that successfully installed the 3rd GE Haliade family member in Østerild (DK) on the 2nd of May 2016. The installation of the three blades was successfully performed in record time by GE and Liftras team of operators using latest Liftra Blade Yoke technology.
 
Our congratulations to GE for the implacable hard work and the sequence of successes achieved already, and in the future. The adventure will continue soon with the installation of the first offshore wind farm in the US, located off the coast of Block Island and Rhode Island, during the second half of 2016. On which Liftra is happy to announce its collaboration with GE for operating and taking full care of the Blade Lifting Yoke.
  
The new Liftra Blade Yokes are the result of more than 13 years of experience,
and can include:
  • DNV approvement and FMECA
  • Fully reduntant operation system
  • Sealed against enviroment for blade protection
The yoke can operate in up to 18m/s winds.
 
Please contact us for knowledge on how the New Liftra Blade yokes are defining the levels of safety, reliability and performance for lifting tools in the Offshore Wind Industry.

Liftra Self-Hoisting Crane model and exhibition

 
Liftra will be showcasing at AWEA 2016 in New Orleans, and will be bringing a live functional 3D printed model of the Liftra Self-Hoisting Crane for showcasing features. Liftra will also be showcasing popular products like Tower Stacking Frames, Blade Stacking Frames and Blade Yokes. 

See you at AWEA 23-26 May
Visit us at Booths, 47394743
 

For more products visit Liftra.com

For more updated news, follow us on LinkedIn and visit Liftra.com

LinkedIn
Liftra.com
Copyright © 2015 Liftra, All rights reserved.

unsubscribe from this list